JOHN ST TOWNHOUSES | REDCLIFFE QLD 4020

Details

Location:

John Street, Redcliffe Qld 4020

Contract Type:

Fixed Price Lump Sum

Project Type:

Multi-Residential

Construction Time:

34 Weeks

Completion Date:

Feb-2017

Description

Located on the thriving desirable Redcliffe Peninsula these high-end townhouses vary in size. Floorplans range from a luxurious 4 bedroom/ 3 bathroom to 2 bedroom/ 1 bathroom units. The 3-storey layout has allowed the developer to utilise the entire site. Set back only a few blocks back from the beach, these townhouses will not last long on the market.
Details
LOCATION: John Street, Redcliffe Qld 4020
CONTRACT TYPE: Fixed Price Lump Sum
PROJECT TYPE: Multi-Residential
CONSTRUCTION TIME: 34 Weeks
COMPLETION DATE: Feb-2017

Description

Located on the thriving desirable Redcliffe Peninsula these high-end townhouses vary in size. Floorplans range from a luxurious 4 bedroom/ 3 bathroom to 2 bedroom/ 1 bathroom units. The 3-storey layout has allowed the developer to utilise the entire site. Set back only a few blocks back from the beach, these townhouses will not last long on the market.

START YOUR NEXT BUILDING PROJECT

Our design and construction processes ensure you remain in control of the entire project. We pride ourselves on adhering to the highest of standards and work alongside you, every step of the journey.
Honest Communication
Long term relationships built on trust and transparency.
Design and Construct
Our team designs, builds and completes quality commercial building projects.